Providing a complete end-to-end solution, TPS deployed multiple specialist teams to fulfil the CNWL project. From project managers through to experienced auditors, engineers and installation teams, TPS co-ordinated the entire process at all 98 sites. TPS’ specialist engineers carried out surveys on cabinets housing existing LAN and identified the need for LAN upgrades to replace switches and re patch to a significantly higher standard.
With vast experience in project co-ordination for complex infrastructures, TPS liaised with CNWL to advise on predicted downtime as well as DCS for individual switch and allocated port device logs. This was required to allow for the existing LAN switches to be taken offline and removed from the comms cabinets, whist being unpatched one switch at a time.
Once completed, TPS engineers installed the new switches and re patched the structured cabling as outlined in the patching log created at the initial audit stage. To ensure that all connectivity had been restored, TPS completed a floor walk inspection.